Customer name |
Description |
Shenzhen Nanshan Power Plant |
My Co. has provided them total electrical sets for 5#&6# MS6001 GT;a total set of combined-circle,installation guide and supervision of three-D transformation for 8 # ST(30 MW); have carried out a number of gas turbine overhaul and technological transformation, including the main auxiliary inspection and repairment, exhaust chamber replacement, and heavy oil transformation; has undertaken the overhaul for gas turbine and steam turbine of 9E combined-cycle |
Shenzhen Nantian(former Meishi) Power Plant |
My Co. has undertaken installation for GEN of 9E Gas turbine-- which made in NGC; has undertaken the overhaul for 5#13E2GT(SwitzerlandABB GT) |
Shenzhen Baochang Power Plant |
My Co. has undertaken the inspection for 9E GT(125000kw) |
Shenzhen Jingang Power Plant |
My Co. has undertaken the installation,commisioning, train,maintenance&operating , as well as replancement of exhaut chamber for MS6001 GT;has undertaken the accident dealment, overhaul and three-D transformation for 4# steem turbine. |
Shenzhen Futian GT Power Plant |
My Co. has provided them the total sets of 2¡Ác6-35/5 combined circle ST sets, and the installation, commisioning and technical guide for two sets. |
Shenzhen Mawan Power Plant |
My Co. has provided them the total 220 KV partial delivery substations equipment. |
Shenzhen Yueliangwan Power Plant |
My Co. has undertaken the overhaul for 2 units GT sets and exhaut chamber changement |
Zhuhai Shenzhen Energy Hongwan Power Plant |
My Co. has undertaken the oil to gas transformation and inspection for their 1#6B GT set |
Humen GT Power Plant |
My Co. has undertaken the installation work for 2¡ÁPG6581B GT set. |
Suzhou Gaoda Power Plant |
My Co. has undertaken the business of oil to gas transformation for 2¡ÁPG6551B GT sets. |
Suzhou Lantian Power Plant |
My Co. has undertaken the project of installation and inspection for 2¡Á9E GT sets. |
Changqing Gas Turbine Power Plant |
My Co. has undertaken the whole project of overhaul,performance adjustment, oil to natural gas transformation for fuel systems and control systems(Mark1),installation, perfamance experiment, maintenance and operation for one year for 2¡ÁPG5301N GT sets, which produced by Japanese Hitachi Co.during the 1970s and imported by Beijing first Power Plant. |
Sichuan Yinghui GT Power Plant |
My Co. has undertaken the project of dismantling,packaging, shipping,installation,inspection, oil to natural gas transformation, performance adjustment,running,training,etc. for 3¡ÁPG5361 GT sets which purchased from Xiamen Power Plant. |
Liuzhou Zhenxing Power Plant |
My Co. has undertaken the repair work for their GT and control room which had been heavily damaged by flood water; has undertaken the project of turbine control panel hot adjustment, the hot section inspection, exhaust chamber changement, as will as upgrades from MKII to MK¢õand training. |
Taizhou Jiaojiang Power Plant |
My Co. has undertaken the work of installation and performance adjustment for their PG6581B GT. |
Ningbo Shunlong Fengshan Power Plant |
My Co. has undertaken the heavy oil treatment and transformation for their PG6541 GT. |
Ningbo Kefeng Power Plant |
My Co. has undertaken the transformation from oil to natural gas, inspetion, as well as repairment for their PG6531B GT. |
Jinhua Power Plant |
My Co. has undertaken the generator system's performance experiment for their gas-steam combined circle . Their set consists of GT from Alstom Power(France), heat recovery boiler from Hangzhou Boiler Co.(China), and steam turbine from NGC. |
Zhejiang Deneng Natural Gas Power Plant |
My Co. has undertaken the pipeline's natural gas generating project. |
Zhejiang Lantian Gas Power Plant |
My Co. has undertaken the installation and performance debugging work for their 2¡ÁPG6581B combined circle GT sets. |
Changzhou Suyuan Power Plant |
My Co. has undertaken the transformation from oil to natural gas for their 3600kw set. |
Jinxi Gas Chemical Co. |
My Co. has undertaken their "Mark VI turbine control panel transformation" project. |
Chongqing Steal Co. |
My Co. has undertaken the installation, maintenance and operationg for their 47000kw low-calorific gas GT. |
Huaneng Chongqing GT Co. |
My Co. has undertaken their GT's overhaul and exhaust room changement for for many times. |
Huaneng Shantou GT Power Plant |
My Co. has undertaken the exhaust room changement |
Liaohe Oil field Oil Gas Concentrating Output Co. |
My Co. has undertaken the overhaul project for their GT. |
Shantou Special Economic Zone GT Power Plant |
My Co. has undertaken the overhaul project for their GT. |
Shengli Oilfield Gubei GT Power Plant |
My Co. has undertaken the project of combution system transformation from gas to crude oil and natrual gas for their 2 units GT sets. |
Chinese Ministry of Nuclear Industry Jianfeng Chemistry General Co. |
My Co. has undertaken the training work for their MK-VI Turbine control pannel. |
Guangdong Dongtang Group |
My Co. has undertaken projects of installation and performance adjustment for their C25-35/5 steem turbine; and overhaul and extraction transformation for their N25-35 steem turbine. |
Guangdong Dongguan Jiulong Paper Co. |
My Co. has undertaken the transformation for their C25-35/10 steem turbine ;installation and performance adjustment for their C50-90/7 steem turbine. |
Guangdong Dongguan Liwen Paper |
My Co. has undertaken the overhaul for their C6-35/5, C15-35/5 and C30-90/5 steem turbine. After the overhaul for their C6-35/5 steem turbine which produced by Qingdao Steem Turbine Co., the long term problem that vibration exceeded standard had been solved. |
Guangdong Jiangmen North Street Power Plant |
My Co. has undertaken the extraction transformation for their N25-35 steem turbine. |
Guangdong Nanhai Power Plant |
My Co. has provided them total 6¡ÁN25-35 steem turbine sets, undertaken the installation and performance adjustment both for steem turbine and electric equipments. |
Nanhai Rubbish Power Plant |
My Co. has understaken their power plant's project. |
Guangdong Shaoguan Steel Power Plant |
My Co. has undertaken the overhaul for their 2¡ÁC25-50/10 steem turbine sets |
Guangdong Yangshan Power Plant |
My Co. has undertaken the overhaul, installation and performance adjustment for their 2¡ÁN25-35 steem turbine sets. |
Guangzhou Wanlida Paper Co. |
My Co. has undertaken the installation and performance adjustment for their C25-35/5 steem turbine. |
Guangzhou Zhujiang Beer Co. |
My co. has undertaken the transformation for their 2¡ÁC12-50/5 steem turbine sets. |
Guangdong Jiangnan Power Plant |
My co. has undertaken the installation and performance adjustment for their 2¡ÁN25-35 steem turbine sets and extraction transformation for their 4¡ÁN25-35 steem turbine sets. |
Guangdong Xinhui Shuangshui Power Plant |
My Co.has understaken the installation and performance adjustment for their 4¡ÁN25-35 steem turbine setss and total three-D transformation for their 2¡ÁN25-35 steem turbine sets. |
Guangzhou Mingzhu CT Power Plant |
My Co. has undertaken the overhaul for 2¡ÁN35-67 steem turbine sets,extraction transformation and electro-hydraulic adjustment&transformation for their2¡ÁN25-35 steem turbine sets. |
Iron Mining Bureau of Liaoning Power Plant |
My Co. has undertaken the overhaul for their 2¡ÁC25-90/5 steem turbine sets. |
The Power Plant of Liaoning Fushun Petrol Plant |
My Co. has undertaken the transformation for their B6-35/5 steem turbine. s |
Jiangsu Pei Town Enveronment Protection Power Plant |
My Co. has undertaken the transformation for their C12-50/5 steem turbine. |
Hunan Yueyang Paper Co. |
My Co. has undertaken the installation and performance adjustment for their C25-35/5 steem turbine. |
Zhejiang Yongke Power Plant |
My Co. has undertaken the overhaul for their 2¡ÁC12-35/5 and 1¡ÁB12-35/5 steem turbine sets |